Phase 1 of this demonstration was operational in November of 2019. This showcase having a treatment capacity of 100 m3/day of wastewater was operated for more than 500 days until June 2021. The results obtained during phase 1 confirmed the exceptionnal performances of the EBR Technology.
Phase 1 also confirmed the improved quality of the sludge from which the settling and dewaterability are faster and easier.
Phase 2 of this demonstration is now under construction at the city of l’Assomption wastewater treatment plant. This phase 2 unit will be built this falls and will have a treatment capacity of 1 000 m3/day, 10 times more than in phase 1.